HOTMUSIC365 × ITSGORGEOUSMUSIQUE

Your music. A prepared release. A clear next step.

Distribution helps deliver your music to listening platforms. The release workspace brings your files, artwork and credits together so our team can review the package and coordinate the partner handoff.

Prepare your release package →

Start with preparation

You can save an incomplete draft and return later under the same account. Uploading files or completing the checklist does not release music publicly. The team and distribution partner still need to confirm rights, terms, suitability and delivery.

BEFORE YOU START

Build the complete picture of your release.

Release information

  • Release title, artist name and format: Single, EP, Album or Catalog transfer.
  • Contact email, genre, language, preferred date and territories.
  • Composition and recording copyright lines.
  • Existing UPC, previous release details and artist profile links, if available.

Every track’s credits

  • Track title, version, primary and featured artists.
  • Legal songwriter names, producer credits, language and explicit-content label.
  • Publishers, ownership splits, lyrics and existing ISRC when available.
  • Identify any missing clearance or ownership information for the team.

Your file checklist

Current app upload limits; the partner may request different specifications.
MaterialWhat to prepareLimit
One master per trackStereo WAV or FLAC, at least 44.1 kHz, 16 or 24 bit. An MP3 radio submission is a separate upload.50 MB per master
Release artworkSquare JPG or PNG, 3000–10000 pixels on each side.One image, up to 15 MB
Supporting permissionsOptional PDFs documenting permissions or releases. Do not upload banking or tax documents.Up to five PDFs, 10 MB each

Each package supports up to 20 tracks and 600 MB total. Each account can save up to 10 packages. Ask the team to arrange a handoff for files above these limits.

IN YOUR RELEASE WORKSPACE

From draft to team review

  1. Sign in with your own account. Choose “New release draft” and enter release details and track credits.
  2. Save release details. Save before attaching files and after editing your metadata. Keep the page open while each file uploads.
  3. Check the saved package. Add artwork and one master per track. Use the package checklist to find missing materials. A complete checklist means materials are ready for team review.
  4. Read the confirmations. Confirm the necessary rights and the partner review terms, then choose “Submit release package for review.”
  5. Return for updates. Open “Release activity” on your package to see recorded submissions and customer-facing team updates, newest first. Tracking begins with this feature; earlier activity may be unavailable. The latest 50 updates are kept in the timeline. Submitted packages lock for review. If staff requests changes, edit the package, save the corrections and submit it again.

Keep your release reference. Email notifications can help, but the saved package and its team update are the place to check progress.

KNOW WHERE THINGS STAND

What does my status mean?

StatusMeaning and next step
DraftYour private work in progress. Save details, add files and complete the checklist before submitting.
SubmittedThe package is saved for team review. Read any team updates; editing is locked.
ReviewingStaff is reviewing the materials. This does not confirm platform acceptance.
Changes requestedRead the team’s message, correct the requested information or files, then resubmit.
Ready for partnerStaff has recorded readiness for the next step. The package has not necessarily been handed off yet.
Sent to partnerStaff has recorded a partner handoff reference. Review or delivery may still be in progress.
DeliveredStaff has recorded delivery with a handoff reference and at least one public release link. Check each linked platform; this does not confirm availability on every platform or in every territory.
DeclinedThe package is not proceeding in its current form. Read the team’s explanation and contact the team about next steps.

Questions before you submit

Do I need an ISRC or UPC already?

If you already have the correct identifiers, provide them. Leave an identifier blank to request partner assignment, subject to review. Do not invent codes. An existing ISRC uses 12 letters and digits without spaces or hyphens; a UPC must have 12 or 13 digits.

Is my preferred release date guaranteed?

No. The team must confirm feasibility with the partner. Missing permissions, files, credits or platform review can affect timing. Coordinate the confirmed date before committing to a rollout.

Can I submit a cover, sample or collaboration?

Only submit material you have the necessary rights to use. Explain ownership and clearance issues to the team. The partner must review its policy and any required permissions; submitting a PDF does not by itself establish clearance.

Does this set my royalties or take a payment?

This workspace collects materials for review. It does not establish distribution royalty terms, create automatic payout splits or take a distribution payment. Confirm those terms through the partner agreement. Artist store sales are a separate service.

Who can see the files?

Your account and approved staff can access the private package. The package is intended for the requested distribution review and partner handoff; it does not publish your masters in the public app.

How do I print the release summary?

On your package card, choose “Open printable release summary,” then “Print or save as PDF.” It includes release information, track credits, filenames, the checklist and customer-facing updates. Files are not attached. Private staff notes and storage paths are excluded. Share the printed copy only with your authorized release team.

What if an upload fails or a saved edit conflicts?

Read the error, confirm the format and size, and refresh the package before retrying. Save metadata before uploading. If another edit changed the package, refresh and review the latest version first. Check that the file appears as ready before submitting.

Keep your release moving.

Choose “Plan this release” on your package to bring its title and preferred date into the rollout planner. Review both fields before saving. Your existing completed tasks and custom milestones are preserved; changing the date shifts custom milestones by the same number of days. Only the title and date are copied. Later changes do not sync automatically, and a plan does not confirm distribution or book promotional services.

Return to your packages to search by title, artist or reference and filter by review status. Need help? Email info@hotmusic365.com with your release reference and the issue. Keep passwords, bank details and tax documents out of the message.

Open your release workspace →

Explore rollout planning · Browse all help guides